top of page
![002](https://static.wixstatic.com/media/ee98f8_01947079e3d54c34b6f46262ce293f39~mv2.jpg/v1/fill/w_147,h_98,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/ee98f8_01947079e3d54c34b6f46262ce293f39~mv2.jpg)
002
![011](https://static.wixstatic.com/media/ee98f8_a46ca4886c274073b1a7a0b46ac333b3~mv2.jpg/v1/fill/w_147,h_98,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/ee98f8_a46ca4886c274073b1a7a0b46ac333b3~mv2.jpg)
011
![020](https://static.wixstatic.com/media/ee98f8_3abe42732e6e404d999f57a86992ef89~mv2.jpg/v1/fill/w_147,h_221,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/ee98f8_3abe42732e6e404d999f57a86992ef89~mv2.jpg)
020
![002](https://static.wixstatic.com/media/ee98f8_01947079e3d54c34b6f46262ce293f39~mv2.jpg/v1/fill/w_147,h_98,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/ee98f8_01947079e3d54c34b6f46262ce293f39~mv2.jpg)
002
1/3
DUBAI
desert board factory
​
Client: Desert Board
Consultant: Amayer Consulting / Dieffenbacher
Main Contractor: Cemento Contracting Company LLC (CECC)
Location: Khalifa Free Zone (KIZAD) , Abu Dhabi
PMI’s scope for the factory included fabrication, supply and installation of structural and non-structural metal works along with the dismantling of cladding sheets, purlins, bracings, modification of existing steel rafters, the extension of steel columns, miscellaneous works and re-erection of roof work.